Telstra has revealed the addition of almost one million new mobile services in the six months to December 2011, but Sensis revenues plummeted 24 percent in 12 months.
read more
William Atkins
Tuesday, 04 December 2007 21:05
The only problem so far encountered occurred on Friday, November 30, when some damage to the insulating foam on the external tank (ET) was discovered. Minor damage to three small areas on the nose of the fuel tank (thin cuts in the foam) was repaired with foam patches. The longest gouge was a little over 2 inches (about 5 centimeters) in length. The patches will cure and harden over a sixteen-hour period. According to NASA mission managers, a delay in launch was not expected from this problem.
In addition, weather at the Florida launch pad is predicted to be good on Thursday afternoon. The maximum temperature for the day is expected to be 75 degrees Fahrenheit (24 degrees Celsius), with partly cloudy conditions, a 10% chance of precipitation, and light winds at about 6 miles (10 kilometers) per hour from the north.
The seven-person crew of the STS-122 mission arrived at the NASA Kennedy Space Center at 12:30 p.m. EST (1730 GMT) on Monday, December 3, 2007, in order to prepare for Thursday’s eleven-day mission to the space station and its installation of the European Space Agency's Columbus module.
This fourth space shuttle mission for 2007, approved for launch on Friday, will be televised on NASA Television. Liftoff on Thursday, December 6th, is scheduled for 4:31 p.m. EST (2131 GMT) from launch pad 39A. Coverage on NASA TV begins at 11:30 a.m. EST.
Loading comments ...

|
Microsoft Office 365Try an easy-to-use set of web-enabled tools for business-class productivity services. Office 365 provides anywhere-access to email, important documents, contacts, and calendars on almost any device. |